Home

Plovdiv-Svilengrad Railway Electrification and Upgrading of Corridors IV and IX

Plovdiv Svilengrad Railway Electrification & Upgrading of Corridors IV and IX Please click on the red rectangle to view in detail the Plovdiv-Svilengrad Railway Electrification and Uprading Phases.

An update of this website is forthcoming subject to the signatures of the Phase 4 contracts for the Civil, Track & Electrification Works in the section from Dimitrovgrad to Svilengrad.

Project Scope:
The project encompasses the reconstruction and partial doubling of approximately 150 km of railway track, construction of a catenary system, traction substations, signaling systems, telecommunications and radio control, as well as structures which will enable the complete doubling of the line in the future.

The objectives of the project are:

  • Improvement of the quality of the transport system in Bulgaria
  • Realization of a railway connection between Europe and Asia
  • Integration of the Bulgarian railway system in the trans-European
  • Provision of financial resources for the development and upgrading of the railway infrastructure
  • Enhancement of the competitiveness of the Bulgarian railway system
  • Reducing the travelling time
  • Reducing the costs for maintenance of the railway infrastructure
  • Increasing the efficiency and reliability of railway passenger and freight services along the route
  • Reducing the transportation taxes
  • Introduction of an up-to-date technology and upgraded standards in the railway transport in Bulgaria, in  line, with the requirements of and practices in EU
  • Improvement of the safety of travel of both passengers and freight  
  • Enhancement of the environment by the electrification of the diesel-powered traction

Financing - Phase 1, Phase 2 & Systems:
EC grant (ISPA)    € 153 million
Bank credit (EIB)  € 150 million 
State budget          €   37 million
Total:                    € 340 million

Financing - Phase 3

EC gant (OPT) : 46 619 374,52 BGN
State co-fiancing: 11 654 843.63 BGN

 

News

A commission opened offers for participation in public procurement for project “Dimitrovgrad – Svilengrad railway upgrading and electrification” 26 May 2011

The Deputy Minister Ivailo Moskovski summarized the results achieved in the transport sector under ISPA 22 January 2011

NRIC signed its first two contracts financed under Operational Programme ‘Transport’ 25 May 2009 Two contracts between NRIC and the Czech Company OHL ZS s.a. and the Euro Geo Rail Consortium were signed...

Minister Mutavchiev will perform a site inspection of the construction activities along the Plovdiv-Svilengrad railway line 24 October 2008 The Minister of Transport, Petar Mutafchiev, will perform a working visit on 27 October 2008...

Minister Mutafchiev made a site inspection along the Plovdiv-Svilengrad Railway Line 09 July 2008 Minister Mutafchiev made a working visit and site inspection along the Plovdiv-Svilengrad Railway Line

Three Infrastructural Contracts Were Signed Today in the System of Transport 05 September 2007 Three infrastructural contracts for building and technical aid were signed today in the presence of the Minister of Transport Peter...

Three Contracts on Infrastructure Projects for Building and Technical Aid Will Be Signed Tomorrow 04 September 2007 Three contracts on infrastructure projects for building and technical aid will be signed tomorrow, September 5th, 2007, at...

The Two Years Period of Administration in MT Is Marked by the Acceleration of the Accomplishment of the Big Infrastructural Projects 03 September 2007 The second year of the present Government administration in the Ministry of Transport is marked by the acceleration of the...

employer

beneficiary

Engineering Supervisor

Phase 1 Contractor

Phase 2 Contractor

Systems Contractor

Phase 3 Contractor

long-term technical assistance

© 2008 Plovdiv-Svilengrad Railway Supervision Team.
Made by Webfactory Bulgaria